Line 2 of the Mexico City Metro
From Cuatro Caminos to Tasqueña by way of the Calzada México-Tacuba, the historic centre and the Calzada de Tlalpan, with 24 stations.
About Line 2
Twenty-four stations and 20.7 km in service (23.4 km with the maneuvering tracks). It starts at Cuatro CaminosES, in the municipality of Naucalpan de Juárez, State of Mexico, and runs underground through Miguel Hidalgo and Cuauhtémoc as far as Pino Suárez. From San Antonio Abad it comes up to the surface and runs down the Calzada de Tlalpan, between Benito Juárez and Coyoacán, to Tasqueña.
Its six interchanges are Tacuba (Line 7), Hidalgo (3), Bellas Artes (8), Pino Suárez (1), ChabacanoES (8 and 9) and Ermita (Line 12). With 212.2 million entries recorded by the operator in 2024, it was the busiest line on the network that year. The full run takes about 38 minutes according to the SEMOVI GTFS, an estimate.
Stations on Line 2
24 stations in the order the operator publishes them, 6 of them interchanges with another line (marked with a ring and the colors of the other lines).
Cuatro Caminos – Tasqueña
24 stations
Hours and frequency on Line 2
| Day | Network service hours |
|---|---|
| Monday to Friday | 5:00 to 24:00 |
| Saturday | 6:00 to 24:00 |
| Sundays and public holidays | 7:00 to 24:00 |
These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.
| Line | Headway, monday to friday | Headway, saturday | Headway, sundays and public holidays |
|---|---|---|---|
| L2 | every 3 min | every 3 min | every 3 min |
An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.
Opened section by section
| Date | Section | Stations |
|---|---|---|
| August 1, 1970 | Tasqueña – Pino Suárez | 11 |
| September 14, 1970 | Pino Suárez – Tacuba | 11 |
| August 22, 1984 | Tacuba – Cuatro Caminos | 2 |
Sections and dates from the line page the operator publishes, in the order it publishes them.
The busiest stations on Line 2
| # | Station | Entries in 2024 (this line) |
|---|---|---|
| 1 | Cuatro CaminosES | 32,300,741 |
| 2 | Tasqueña | 18,243,171 |
| 3 | Zócalo/Tenochtitlan | 14,048,881 |
| 4 | Pino Suárez | 11,265,780 |
| 5 | Hidalgo | 10,881,676 |
Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.
History
The line was part of the network’s original plan. The first route ran from Tacuba to the historic centre and ended at Plaza Tlaxcoaque; it was then extended south along the Calzada de Tlalpan, when it was decided to do away with the tram that ran that way. Two stations were planned in the centre, “Catedral” and “Salvador”, and dropped because of the ground conditions and two water mains. The present Zócalo/Tenochtitlan and Allende were built instead, and the excavation for “Salvador” was put to use as the underground walkway to Pino Suárez.
The Tasqueña–Pino Suárez stretch, with 11 stations, opened on August 1, 1970, and the one from Pino Suárez to Tacuba, with another 11, on September 14. Many stations were decorated with mosaics. On October 20, 1975 a train standing at Viaducto was struck by another: 31 people died, and after the accident automatic train protection was installed across the network. On August 22, 1984 the line reached Panteones and Cuatro Caminos, the first Metro station in the State of Mexico. The fire at Central Control Post I, on January 9, 2021, left it without service until February 8.
How the service works
Line 2 runs on rubber-tired trains. The hours the operator publishes are those of the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a headway of about 3 minutes, an estimate. According to press reports, between February 9 and the end of June 2026 there were partial closures for the renovation works on the Calzada de Tlalpan; the most recent report, of June 27, 2026, says the line is running end to end. Zócalo/Tenochtitlan closes from time to time for events on the Plaza de la Constitución.
The trains
It opened, like Line 1, with 26 MP-68 trains, and later received NM-73 sets. After the extension to Cuatro Caminos came Alstom’s MP-82s, 30 NM-83A trains from the Mexican firm Concarril and NC-82 trains from Bombardier. In 2002 the operator bought 45 NM-02 trains, built jointly by CAF and Bombardier, with walk-through gangways between cars and recorded station announcements; they have run on the line since 2004.
Frequently asked questions
On October 20, 1975 a train standing at Viaducto was hit from behind by another coming from Chabacano. Thirty-one people died and 71 were injured: it was the Metro’s first fatal accident. Automatic train protection was installed across the network afterwards.
There is an underground walkway between Zócalo/Tenochtitlan and Pino Suárez. It was made using the excavation for “Salvador”, a station planned on Calle República de El Salvador that was dropped because two water mains already occupied the space.
The ten stations from San Antonio Abad to Tasqueña, along the Calzada de Tlalpan, are at ground level; they were built with reinforced concrete walls on strip footings. The other 14, from Cuatro Caminos to Pino Suárez, are underground.