--:-- · Mexico City

Line 6 of the Mexico City Metro

From El Rosario to Martín Carrera through Azcapotzalco and Gustavo A. Madero: 11 stations across the north of the city.

About Line 6

Stations
114 with an interchange
Route
El Rosario – Martín Carrera
Length
11.43 kmin service; 13.95 km in all including the maneuvering tracks, according to the operator
Opened
1983December 21, 1983
Wheels
Rubber-tiredtrains on rubber tires
Ridership 2024
38.8 millionentries at its stations, as counted by the operator

Eleven stations and 11.4 km in service (13.9 km with the maneuvering tracks) between El RosarioES, in Azcapotzalco, and Martín CarreraES, in Gustavo A. Madero. Apart from El Rosario, which is at ground level, all of them run underground. It calls, among others, at UAM Azcapotzalco, Ferrería/Arena Ciudad de México, Lindavista and La Villa/Basílica.

It has four interchanges: El Rosario (Line 7), Instituto del Petróleo (5), Deportivo 18 de Marzo (3) and Martín Carrera (4). With 38.8 million entries recorded by the operator in 2024, it is the second quietest line on the network, after Line 4. The SEMOVI GTFS estimates about 18 minutes end to end.

Stations on Line 6

11 stations in the order the operator publishes them, 4 of them interchanges with another line (marked with a ring and the colors of the other lines).

Hours and frequency on Line 6

DayNetwork service hours
Monday to Friday5:00 to 24:00
Saturday6:00 to 24:00
Sundays and public holidays7:00 to 24:00

These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.

LineHeadway, monday to fridayHeadway, saturdayHeadway, sundays and public holidays
L6every 4 minevery 4 minevery 4 min

An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.

Opened section by section

DateSectionStations
December 21, 1983El Rosario – Instituto del Petróleo7
July 8, 1986Instituto del Petróleo – Martín Carrera4

Sections and dates from the line page the operator publishes, in the order it publishes them.

The busiest stations on Line 6

#StationEntries in 2024 (this line)
1Martín CarreraES8,080,888
2Ferrería/Arena Ciudad de MéxicoES6,610,102
3El RosarioES5,162,525
4LindavistaES5,098,291
5La Villa/Basílica3,786,430

Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.

History

Line 6 was built with underground boxes placed in cut-and-cover excavations, using diaphragm walls, tubular struts and a lattice of precast panels. Unlike the earlier lines, its track was laid on a concrete slab instead of ballast, a bed that costs less to maintain and makes for a quieter ride. It was possible because that western part of the city does not suffer the differential subsidence that forces other lines to use ballast.

It opened on December 21, 1983 with seven stations and 9.3 km, from El Rosario to Instituto del Petróleo: El Rosario, Tezozómoc, UAM Azcapotzalco, Ferrería/Arena Ciudad de México, Norte 45, Vallejo and Instituto del Petróleo. Its only extension, on July 8, 1986, added Lindavista, Deportivo 18 de Marzo, La Villa/Basílica and Martín Carrera, bringing it to 13.9 km. The fire at Central Control Post I left it without service from January 9 to 12, 2021, and since September 2, 2023 entry is card-only.

How the service works

Line 6 runs on rubber-tired trains. The operator publishes a single set of hours for the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 4 minutes, an estimate. As of October 20, 2026 we had no record of long closures. To combine it with lines 3, 5 or 7, use the route planner.

Frequently asked questions

Unlike the earlier lines, its track was laid on a concrete slab instead of ballast. That bed costs less to maintain and makes the trains quieter, and it could be used because that part of the city does not have the differential subsidence found elsewhere.

On July 8, 1986, with its only extension: four stations beyond Instituto del Petróleo, adding LindavistaES, Deportivo 18 de Marzo, La Villa/Basílica and Martín Carrera. Until then the line ended at Instituto del Petróleo.

No. Since September 2, 2023 Line 6 takes only the Movilidad Integrada card. There is more detail on the fares page.