Mexico City Metro: map, lines and stations
A guide to the Mexico City Metro: the 12 lines and their stations, service hours, the fare, ridership and a route planner.
Service status
Mexico City Metro status
Service status
Observatorio – Pantitlán
Cuatro Caminos – Tasqueña
Indios Verdes – Universidad
Martín Carrera – Santa Anita
Pantitlán – Politécnico
El Rosario – Martín Carrera
El Rosario – Barranca del Muerto
Garibaldi/Lagunilla – Constitución de 1917
Tacubaya – Pantitlán
Pantitlán – La Paz
Ciudad Azteca – Buenavista
Mixcoac – Tláhuac
The lines of the Mexico City Metro
Each line has its own page with the stations in order, where they meet other lines and when they opened.












The Mexico City Metro in numbers
According to its own operating figures, the operator has 12 lines and 195 stations, had 216.85 km of network in service in 2024 — its table of lengths gives 226.488 km of network and 200.881 km in service — and recorded 1,171,859,113 entries in 2024 (149,996,606 of them free entries). It counts stations by line: the 28 interchanges, such as Pantitlán (four lines) or TacubayaES and ChabacanoES (three), count once for each line. Counting each station once, the network has 163 physical stations, and that is how this guide is organised: one page per station.
Of those, 11 are in the State of Mexico (Cuatro CaminosES, in Naucalpan, and Ciudad AztecaES, in Ecatepec, for example); the rest are in the boroughs of Mexico City. The first section, Zaragoza – Chapultepec, opened on September 4, 1969.
This guide takes what the operator publishes and the open data of the Department of Mobility (SEMOVI) and turns it into one page per station and per line, every figure carrying the date it came from.
The busiest stations
The 10 stations with the most entries in 2024, the last full year published.
| # | Station | Lines | Entries in 2024 |
|---|---|---|---|
| 1 | Pantitlán (incomplete year*) | L1 L5 L9 LA | 41,546,181 |
| 2 | Constitución de 1917ES | L8 | 34,866,831 |
| 3 | Cuatro CaminosES | L2 | 32,300,741 |
| 4 | Indios VerdesES | L3 | 29,859,194 |
| 5 | TacubayaES (incomplete year*) | L1 L7 L9 | 23,378,634 |
| 6 | Pino Suárez | L1 L2 | 20,570,140 |
| 7 | Universidad | L3 | 18,267,530 |
| 8 | Tasqueña | L2 | 18,243,171 |
| 9 | Buenavista | LB | 18,137,887 |
| 10 | TláhuacES | L12 | 15,555,130 |
Station ridership by line for 2024 as published by the operator (recorded entries; at interchanges, the sum of its lines). *Incomplete year: it has quarters with no entries on one of its lines because of closures for works in 2024 (Pantitlán: The operator records Line 9 with no entries in January–March and April–June in 2024; Tacubaya: The operator records Line 1 with no entries in January–March, April–June, July–September and October–December in 2024), so the figure falls short.
Popular journeys
Estimated time: running time between stations, the average wait and 5 minutes per transfer.
