Line 3 of the Mexico City Metro
From Indios Verdes, in Gustavo A. Madero, to Universidad, in Coyoacán: 21 stations from north to south with seven interchanges.
About Line 3
Twenty-one stations and 21.3 km in service (23.6 km with the maneuvering tracks) between Indios VerdesES and Universidad. The three northern ones, Indios Verdes, Deportivo 18 de Marzo and Potrero, and the southern terminus are at ground level; the other 17 run underground. The route leaves Gustavo A. Madero, crosses Cuauhtémoc and Benito Juárez and ends in Coyoacán.
It has seven interchanges: Deportivo 18 de Marzo (Line 6), La Raza (5), Guerrero (B), Hidalgo (2), Balderas (1), Centro MédicoES (9) and Zapata (12). In 2024 the operator recorded 172.3 million entries at its stations, the second highest of the 12 lines, behind Line 2. End to end it takes about 39 minutes, according to the SEMOVI GTFS estimate.
Stations on Line 3
21 stations in the order the operator publishes them, 7 of them interchanges with another line (marked with a ring and the colors of the other lines).
Indios Verdes – Universidad
21 stations
Hours and frequency on Line 3
| Day | Network service hours |
|---|---|
| Monday to Friday | 5:00 to 24:00 |
| Saturday | 6:00 to 24:00 |
| Sundays and public holidays | 7:00 to 24:00 |
These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.
| Line | Headway, monday to friday | Headway, saturday | Headway, sundays and public holidays |
|---|---|---|---|
| L3 | every 3 min | every 3 min | every 3 min |
An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.
Opened section by section
| Date | Section | Stations |
|---|---|---|
| November 20, 1970 | Tlatelolco – Hospital General | 7 |
| August 25, 1978 | Tlatelolco – La Raza | 1 |
| December 1, 1979 | La Raza – Indios Verdes | 3 |
| June 7, 1980 | Hospital General – Centro Médico | 1 |
| August 25, 1980 | Centro Médico – Zapata | 4 |
| August 30, 1983 | Zapata – Universidad | 5 |
Sections and dates from the line page the operator publishes, in the order it publishes them.
The busiest stations on Line 3
| # | Station | Entries in 2024 (this line) |
|---|---|---|
| 1 | Indios VerdesES | 29,859,194 |
| 2 | Universidad | 18,267,530 |
| 3 | Copilco | 11,420,379 |
| 4 | Miguel Ángel de Quevedo | 10,694,043 |
| 5 | Deportivo 18 de MarzoES | 9,453,739 |
Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.
History
The first plan was to join the Basilica of Guadalupe with the Churubusco area, but the northern stretch was dropped because it clashed with the drains of the Gran Canal del Desagüe, and the line was diverted towards Tlatelolco. Some stations changed their names before opening: “Martínez de la Torre” became Guerrero and “Morelos” became Juárez. Work began on June 19, 1968 at Balderas, and the excavation turned up the “Hombre de Balderas”, a 12-thousand-year-old skull.
The first stretch, Tlatelolco–Hospital General, opened on November 20, 1970 with seven stations. The line then grew in stages: La Raza on August 25, 1978; Potrero, Deportivo 18 de Marzo and Indios Verdes on December 1, 1979; Centro Médico on June 7, 1980, and as far as Zapata on August 25 of that year. On August 30, 1983 the last five opened, from Coyoacán to Universidad. After the 1985 earthquake, Balderas and Juárez closed for a few days because neighbouring buildings were at risk of collapse. On January 7, 2023 a collision between trains between Potrero and La Raza left one person dead and 59 injured.
How the service works
Line 3 runs on rubber-tired trains. The operator publishes the same hours for the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 3 minutes, an estimate and not a figure from the operator. As of October 20, 2026 we had no record of long closures on the line. If you are combining several lines, the route planner gives you the journey with its transfers.
The trains
At first five MP-68 trains ran, and for about three years NM-73 sets. In the eighties the firm Concarril built 58 NM-79 trains for the operator, the model that has been on the line ever since; some were refurbished in the nineties. Today the line is served by NM-79 trains, NM-83As that came from Line 2 and NE-92s from Line 1.
Frequently asked questions
It was to be called “Centro Bancomer”, after the bank’s nearby headquarters, but the name was changed shortly before opening so that the Metro would not use commercial names. Coyoacán was chosen, a name that has been questioned because the station is in Benito Juárez.
A 12-thousand-year-old skull found during the excavation for Line 3, which began on June 19, 1968 at Balderas. It was named after Avenida Balderas, the area where it turned up.
The original plan did include it, but that northern route would have clashed with the feeder drains of the Gran Canal del Desagüe, a work that is central to protecting the city from flooding. So the line was diverted towards Tlatelolco and later carried on north to Indios Verdes.