Line 12 of the Mexico City Metro
From Mixcoac to Tláhuac, the Metro’s newest line crosses the south with steel-wheeled trains and an elevated stretch.
About Line 12
Under construction, not in service: Valentín Campa, Álvaro Obregón and Observatorio. They are not part of the network or of the route on this page.
Twenty stations and 23.9 km in service (25.1 km with the maneuvering tracks) between MixcoacES, in Benito Juárez, and TláhuacES. From Mixcoac to Atlalilco it runs underground; from Culhuacán to Zapotitlán, on an elevated viaduct, and Tlaltenco and Tláhuac are at ground level. It crosses the boroughs of Benito Juárez, Iztapalapa and Tláhuac.
It has four interchanges: Mixcoac (Line 7), Zapata (3), Ermita (2) and AtlalilcoES (8). Like Line A, it uses steel-wheeled trains powered from an overhead line. In 2024 the operator recorded 105.0 million entries at its stations. Riding it end to end takes about 55 minutes according to the SEMOVI GTFS, an estimate.
Stations on Line 12
20 stations in the order the operator publishes them, 4 of them interchanges with another line (marked with a ring and the colors of the other lines).
Hours and frequency on Line 12
| Day | Network service hours |
|---|---|
| Monday to Friday | 5:00 to 24:00 |
| Saturday | 6:00 to 24:00 |
| Sundays and public holidays | 7:00 to 24:00 |
These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.
| Line | Headway, monday to friday | Headway, saturday | Headway, sundays and public holidays |
|---|---|---|---|
| L12 | every 2 min | every 2.5 min | every 3 min |
An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.
Opened section by section
| Date | Section | Stations |
|---|---|---|
| October 30, 2012 | Mixcoac – Tláhuac | 20 |
Sections and dates from the line page the operator publishes, in the order it publishes them.
The busiest stations on Line 12
| # | Station | Entries in 2024 (this line) |
|---|---|---|
| 1 | TláhuacES | 15,555,130 |
| 2 | Periférico OrienteES | 11,061,651 |
| 3 | Insurgentes SurES | 10,683,601 |
| 4 | NopaleraES | 6,235,518 |
| 5 | TezoncoES | 6,067,056 |
Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.
History
On July 29, 2007, in what was called the Consulta Verde, people were asked about two routes, Iztapalapa–Acoxpa and Iztapalapa–Tláhuac; the second won, and on August 8 the project was presented as “Line 12: the golden line, the line of the Bicentenary”. It was built by ICA, Alstom and Carso, which signed the contract on June 17, 2008; work began on September 23 of that year. Along the way stations such as Sur 69, Vía Láctea and Ganaderos were dropped, and Francisco Villa was renamed Nopalera.
Marcelo Ebrard and Felipe Calderón opened it on October 30, 2012. On March 11, 2014 service between Tláhuac and Culhuacán was suspended because of serious faults on the elevated stretch; it reopened in parts on October 28 and November 29, 2015. The earthquake of September 19, 2017 closed part of the elevated stretch again until October 30. On May 3, 2021 a beam between Olivos and Tezonco gave way and fell onto Avenida Tláhuac with a train on it; the first figures given were 26 dead and 80 injured. The whole line closed. The underground stretch reopened on January 15, 2023, Culhuacán–Periférico Oriente on July 15, 2023 and the rest of the elevated stretch on January 30, 2024.
How the service works
Line 12 is steel-wheeled, with trains powered from an overhead line. Its hours are those of the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models headways of 2 minutes on weekdays, 2.5 on Saturdays and 3 on Sundays, as an estimate. According to press reports, in September 2026 there were maintenance closures at nine stations over the Fiestas Patrias, with service only between Mixcoac and San Andrés Tomatlán. The extension to Observatorio is still under construction and not in service.
The trains
The line was designed with seven-car trains, steel-wheeled and powered from an overhead line, built by Construcciones y Auxiliar de Ferrocarriles (CAF) in Spain. The 2014 assessment by Systra and TSO called, among other things, for the wheel profile to be changed to match the French standard NF-F-03-402. In 2015 the line resumed service with 15 refurbished trains and 15 unrefurbished ones. According to the SICT, in April 2026 the second phase of the extension included the purchase of about 12 new trains.
Frequently asked questions
According to press reports of July 2026, the director of the agency for trains and integrated public transport estimated that the works would finish in 2028 and that Valentín Campa, Álvaro Obregón and Observatorio would start running in 2029. At that point the first two were 28 % and 30 % complete. Until it opens, the western terminus is Mixcoac.
That night, a steel beam holding the track box between OlivosES and Tezonco gave way and fell onto Avenida Tláhuac with a train running over it. The first figures given were 26 dead and 80 injured. The line closed completely and reopened in stages between 2023 and January 30, 2024.
On August 8, 2007 the project was officially presented under the name “Line 12: the golden line, the line of the Bicentenary”, and gold stayed as its graphic identity. The route, from Mixcoac to Tláhuac, came out of the Consulta Verde of July 29 that year.