--:-- · Mexico City

Line 8 of the Mexico City Metro

From Garibaldi/Lagunilla to Constitución de 1917 along the Eje Central and through Iztapalapa: 19 stations, all opened on the same day in 1994.

About Line 8

Stations
196 with an interchange
Route
Garibaldi/Lagunilla – Constitución de 1917
Length
17.68 kmin service; 20.08 km in all including the maneuvering tracks, according to the operator
Opened
1994July 20, 1994
Wheels
Rubber-tiredtrains on rubber tires
Ridership 2024
124.6 millionentries at its stations, as counted by the operator

Nineteen stations and 17.7 km in service (20.1 km with the maneuvering tracks) between Garibaldi/Lagunilla, in Cuauhtémoc, and Constitución de 1917ES, in Iztapalapa. It runs along the Eje Central in the north, crosses Venustiano Carranza and Iztacalco and enters Iztapalapa. Coyuya, Iztacalco, Apatlaco, Aculco and the southern terminus are at ground level; the rest are underground.

It has six interchanges: Garibaldi/Lagunilla (Line B), Bellas Artes (2), Salto del Agua (1), Chabacano (2 and 9), Santa Anita (4) and AtlalilcoES (12). In 2024 the operator recorded 124.6 million entries at its stations. End to end it takes about 31 minutes, according to the SEMOVI GTFS estimate.

Stations on Line 8

19 stations in the order the operator publishes them, 6 of them interchanges with another line (marked with a ring and the colors of the other lines).

Hours and frequency on Line 8

DayNetwork service hours
Monday to Friday5:00 to 24:00
Saturday6:00 to 24:00
Sundays and public holidays7:00 to 24:00

These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.

LineHeadway, monday to fridayHeadway, saturdayHeadway, sundays and public holidays
L8every 4 minevery 4 minevery 4 min

An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.

Opened section by section

DateSectionStations
July 20, 1994Garibaldi/Lagunilla – Constitución de 191719

Sections and dates from the line page the operator publishes, in the order it publishes them.

The busiest stations on Line 8

#StationEntries in 2024 (this line)
1Constitución de 1917ES34,866,831
2CoyuyaES8,976,978
3San Juan de Letrán8,458,803
4UAM-IES7,944,244
5Garibaldi/Lagunilla6,987,952

Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.

History

The original plan started at Indios Verdes, passed the Basilica of Guadalupe with a La Villa station, crossed the historic centre by the Zócalo and ended at Pantitlán. Work began on November 29, 1983 on Calle 20 de Noviembre, between Plaza Tlaxcoaque and the Plaza de la Constitución. The Instituto Nacional de Antropología e Historia objected because the excavation could damage the buildings and the archaeological remains of the centre: on December 9 its researchers protested outside the works and on December 14 its director, Enrique Florescano, revoked the permit.

In September 1984 the INAH and the city authorities agreed to resume it on another route, along the Eje Central. The northern stretch was cut back to Garibaldi for budget reasons and the southern one was diverted towards Iztapalapa. The underground stations were built by cut-and-cover with precast reinforced concrete pieces; in the south, the rocky ground of the Sierra de Santa Catarina made extra supports unnecessary. The line opened complete on July 20, 1994, with 19 stations.

How the service works

Line 8 runs on rubber-tired trains. The operator publishes a single set of hours for the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 4 minutes, an estimate. As of October 20, 2026 we had no record of long closures on the line. At ChabacanoES you can change to lines 2 and 9; to combine them, try the route planner.

Frequently asked questions

The original route crossed the historic centre, but the INAH revoked the construction permit on December 14, 1983 because of the risk to the buildings and the archaeological remains. In September 1984 it was agreed to take it along the Eje Central instead.

The original plan started at Indios Verdes, but when work resumed in 1984 the northern stretch was cut back to Garibaldi/Lagunilla for budget reasons. The southern stretch, by contrast, was changed to reach Iztapalapa.

They have glazed clay tiles, basaltín tiling and Santo Tomás marble floors. The walls of the underground ones combine resins with silica and quartz sands, porcelain-coated sheet, Venetian mosaic and paint, and the transfer walkways have travertine marble screens.