Line 1 of the Mexico City Metro
The Metro’s first line, opened in 1969, joins Observatorio and Pantitlán by way of Avenida Chapultepec, Izazaga and the Merced.
About Line 1
Twenty stations and 16.7 km in service (18.8 km counting the maneuvering tracks) between Observatorio, in Álvaro Obregón, and Pantitlán, on the boundary of Venustiano Carranza and Iztacalco. Apart from Observatorio, which is at ground level, all of them are underground. The route follows Avenida Chapultepec, passes beneath Arcos de Belén, Izazaga and San Pablo, crosses under the La Candelaria quarter and the Merced market and heads east along the Calzada Ignacio Zaragoza.
It has seven interchanges: TacubayaES (lines 7 and 9), Balderas (3), Salto del Agua (8), Pino Suárez (2), Candelaria (4), San Lázaro (B) and Pantitlán (5, 9 and A). In 2024, with several stations closed for works all year or part of it, the operator recorded 67.8 million entries at its stations.
Stations on Line 1
20 stations in the order the operator publishes them, 7 of them interchanges with another line (marked with a ring and the colors of the other lines).
Hours and frequency on Line 1
| Day | Network service hours |
|---|---|
| Monday to Friday | 5:00 to 24:00 |
| Saturday | 6:00 to 24:00 |
| Sundays and public holidays | 7:00 to 24:00 |
These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.
| Line | Headway, monday to friday | Headway, saturday | Headway, sundays and public holidays |
|---|---|---|---|
| L1 | every 4 min | every 4 min | every 4 min |
An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.
Opened section by section
| Date | Section | Stations |
|---|---|---|
| September 4, 1969 | Zaragoza – Chapultepec | 16 |
| April 11, 1970 | Chapultepec – Juanacatlán | 1 |
| November 20, 1970 | Juanacatlán – Tacubaya | 1 |
| June 10, 1972 | Tacubaya – Observatorio | 1 |
| August 22, 1984 | Zaragoza – Pantitlán | 1 |
Sections and dates from the line page the operator publishes, in the order it publishes them.
The busiest stations on Line 1
| # | Station | Entries in 2024 (this line) |
|---|---|---|
| 1 | Pantitlán | 10,147,353 |
| 2 | Merced | 9,740,418 |
| 3 | Pino Suárez | 9,304,360 |
| 4 | ZaragozaES | 7,188,568 |
| 5 | Gómez FaríasES | 5,557,948 |
Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.
History
Work began on June 19, 1967 at the crossing of Avenida Chapultepec and Bucareli, near the future Cuauhtémoc station. It was dug by cut-and-cover on the bed of the old Lake Texcoco: the groundwater had to be pumped out and parallel walls raised before digging, and the finished structure had to weigh the same as the earth taken out so that it would not sink. The architect Félix Candela designed Candelaria, Merced and San Lázaro.
President Gustavo Díaz Ordaz opened the Zaragoza–Chapultepec stretch, with 16 stations, on September 4, 1969. Juanacatlán was added on April 11, 1970, Tacubaya on November 20 of that year and Observatorio on June 10, 1972. Pantitlán, the eastern terminus, opened on August 22, 1984. After the earthquake of September 19, 1985 the Cuauhtémoc–Merced stretch was closed because neighbouring buildings were at risk of collapse; the last to reopen was Isabel la Católica, on November 4.
On July 9, 2022 the line began to close in stages for a complete rebuild: new track, renewed electrical and electronic systems, communications-based train control (CBTC) and 29 NM-22 trains. According to press reports, the line was running end to end again between Pantitlán and Observatorio on November 16, 2025.
How the service works
Line 1 runs on rubber-tired trains. The operator publishes a single set of hours for all its lines: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 4 minutes and about 33 minutes end to end; those are estimates, not figures from the operator. According to press reports, since November 16, 2025 the line has been running end to end after the rebuild. For a journey with transfers, try the route planner.
The trains
The line opened with 26 MP-68 trains of nine cars and 150 m in length, a configuration that became the standard on the other lines. Later came NM-73, MP-82 and NM-83 models and, from 1994, 15 NE-92 trains from CAF, the first on the network to depart from the MP-68 design. Ten NM-16 trains were later bought from CAF. The rebuild plans for the line to run with those NM-16s and with the 29 NM-22s built by CRRC Zhuzhou Locomotive.
Frequently asked questions
For the complete rebuild that began on July 9, 2022. The first phase was handed over on October 29, 2023; on November 9 the western stretch closed. Salto del Agua and Balderas reopened on September 13, 2024, the stretch as far as Chapultepec on April 23, 2025 and, according to press reports, the one to Observatorio on November 16, 2025.
More than 13 thousand archaeological pieces were recovered, collected by the Instituto Nacional de Antropología e Historia. Among them are the shrine to Ehécatl, at Pino Suárez, and the “Coatlicue del Metro”, a 1.2-metre statue of the goddess Tlaltecuhtli found near Isabel la Católica.
The plan included a station called “Archivo de la Nación”, near the Archivo General de la Nación, between Candelaria and San Lázaro. It was dropped because it fell on a tight curve that made it impossible to build.