--:-- · Mexico City

Line 4 of the Mexico City Metro

From Martín Carrera to Santa Anita along the Eje 2 Oriente: the Metro’s first elevated line, with ten stations.

About Line 4

Stations
106 with an interchange
Route
Martín Carrera – Santa Anita
Length
9.36 kmin service; 10.75 km in all including the maneuvering tracks, according to the operator
Opened
1981August 29, 1981
Wheels
Rubber-tiredtrains on rubber tires
Ridership 2024
24.9 millionentries at its stations, as counted by the operator

Ten stations and 9.4 km in service (10.7 km with the maneuvering tracks) between Martín CarreraES, in Gustavo A. Madero, and Santa AnitaES, in Iztacalco. Almost the whole route runs on an elevated viaduct; only Martín Carrera and Candelaria are at street level. A bus stand was built at the northern terminus to connect with the municipalities of the State of Mexico.

Six of its ten stations are interchanges: Martín Carrera (Line 6), Consulado (5), Morelos (Line B), Candelaria (1), Jamaica (9) and Santa Anita (8). With 24.9 million entries recorded by the operator in 2024, it is the quietest line on the network. Riding it end to end takes about 16 minutes according to the SEMOVI GTFS, an estimate.

Stations on Line 4

10 stations in the order the operator publishes them, 6 of them interchanges with another line (marked with a ring and the colors of the other lines).

Hours and frequency on Line 4

DayNetwork service hours
Monday to Friday5:00 to 24:00
Saturday6:00 to 24:00
Sundays and public holidays7:00 to 24:00

These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.

LineHeadway, monday to fridayHeadway, saturdayHeadway, sundays and public holidays
L4every 4 minevery 4 minevery 4 min

An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.

Opened section by section

DateSectionStations
August 29, 1981Martín Carrera – Candelaria7
May 26, 1982Candelaria – Santa Anita3

Sections and dates from the line page the operator publishes, in the order it publishes them.

The busiest stations on Line 4

#StationEntries in 2024 (this line)
1Martín CarreraES7,157,992
2CandelariaES3,039,796
3Fray ServandoES2,990,448
4Canal del NorteES2,395,850
5MorelosES2,312,884

Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.

History

The original plan left Candelaria, passed the Zócalo and carried on north to the Basilica of Guadalupe. It was changed for a route along the Eje 2 Oriente, which was being built at the time and made the work easier. Construction began on March 20, 1978 and it was the system’s first line on an elevated viaduct: post-tensioned beams cast in place on a single row of central columns, with spans of 18 to 42.5 metres. The works at TalismánES turned up the remains of a mammoth, which are on show in the station itself.

José López Portillo and Carlos Hank González opened it on August 29, 1981 with seven stations, from Martín Carrera to Candelaria. Its only extension, on May 26, 1982, added Fray Servando, Jamaica and Santa Anita. After the earthquake of September 19, 1985 it closed so that the structure could be checked and reopened the next day. On September 2, 2023 it was the first line to stop accepting the magnetic ticket: since then you get in only with the Movilidad Integrada card. In November 2024 the Mexico City and State of Mexico governments announced a plan to extend it to Las Américas, in Ecatepec de Morelos.

How the service works

Line 4 runs on rubber-tired trains. The service hours are set by the operator for the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 4 minutes, an estimate. Since September 2, 2023 entry is card-only; see the fares page. As of October 20, 2026 we had no record of long closures on the line.

The trains

From the opening in 1981 until the late nineties it was run by nine-car MP-68 trains. NM-79 trains were also assigned to it in 1981, moving shortly afterwards to Line 3. The line then mostly received NM-73 sets, with classic and CAF cabs; in 2004 they were cut from nine cars to six because of the low number of passengers.

Frequently asked questions

Yes. The remains of a mammoth turned up while Talismán was being built, and they were put on show inside the station itself, which opened with the line on August 29, 1981.

The original plan ran from Candelaria to the Zócalo and from there north to the Basilica of Guadalupe. It was dropped in favour of a route along the Eje 2 Oriente, which was then under construction and made it easier to raise the viaduct.

Since September 2, 2023. It was the first line to drop the magnetic ticket and the second to be card-only, after Line 12, which has worked that way since it was built. To get in you need the Movilidad Integrada card.