Line 5 of the Mexico City Metro

From Pantitlán to Politécnico through Venustiano Carranza and Gustavo A. Madero: 13 stations, five of them interchanges.

About Line 5

Stations
135 with an interchange
Route
Pantitlán – Politécnico
Length
14.44 kmin service; 15.68 km in all including the maneuvering tracks, according to the operator
Opened
1981December 19, 1981
Wheels
Rubber-tiredtrains on rubber tires
Ridership 2024
59.6 millionentries at its stations, as counted by the operator

Thirteen stations and 14.4 km in service (15.7 km with the maneuvering tracks) between Pantitlán and PolitécnicoES, within the boroughs of Venustiano Carranza and Gustavo A. Madero. Hangares, Terminal Aérea, Valle Gómez and Misterios are underground; the other nine are at ground level. The interchanges are Pantitlán (lines 1, 9 and A), Oceanía (B), Consulado (4), La Raza (3) and Instituto del Petróleo (6).

It has one technical peculiarity: it has connecting tracks at every one of its interchanges, which lets trains be taken to the heavy maintenance depots at Ticomán and Zaragoza without going through lines 1 and 3. In 2024 the operator recorded 59.6 million entries at its stations, and the SEMOVI GTFS estimates about 24 minutes end to end.

Stations on Line 5

13 stations in the order the operator publishes them, 5 of them interchanges with another line (marked with a ring and the colors of the other lines).

Hours and frequency on Line 5

DayNetwork service hours
Monday to Friday5:00 to 24:00
Saturday6:00 to 24:00
Sundays and public holidays7:00 to 24:00

These are the service hours the operator publishes for the whole network, the same at every station. It does not publish a first and last train time for each station: a train leaving a terminus at opening time takes a few minutes to reach the others, and service can change on special days.

LineHeadway, monday to fridayHeadway, saturdayHeadway, sundays and public holidays
L5every 3 minevery 3 minevery 3 min

An estimate: it is the single headway the SEMOVI GTFS models for the whole line and the whole day (open data, valid until December 31, 2025). The operator does not publish headways by time of day; at peak and off-peak times the real interval changes.

Opened section by section

DateSectionStations
December 19, 1981Consulado – Pantitlán7
July 1, 1982La Raza – Consulado3
August 30, 1982La Raza – Politécnico3

Sections and dates from the line page the operator publishes, in the order it publishes them.

The busiest stations on Line 5

#StationEntries in 2024 (this line)
1Pantitlán18,498,753
2PolitécnicoES9,278,142
3Autobuses del Norte6,914,785
4Terminal Aérea5,102,670
5La RazaES3,352,554

Station ridership by line for 2024 as published by the operator (recorded entries). At interchanges only the share belonging to this line is counted.

History

Construction was to begin in 1973, but was put off for lack of money. It started on June 29, 1978 at the crossing of Avenida Hangares and Avenida Economía, north-east of colonia Federal. The underground sections were dug by cut-and-cover, pumping out the groundwater and building parallel walls, through the bed of the old Lake Texcoco.

On December 19, 1981 the first stretch opened, Pantitlán–Consulado, with seven stations. The plan included another, “Simón Bolívar”, between Eduardo Molina and Consulado, which was not built for lack of budget. On July 1, 1982 Valle Gómez, Misterios and La Raza were added, and on August 30 of that year Autobuses del Norte, Instituto del Petróleo and Politécnico.

On May 4, 2015 two trains collided at Oceanía and twelve people were injured: a controller let a train move before the platform was clear and the driver did not switch to manual driving despite the rain. The fire at Central Control Post I left it without service from January 9 to 12, 2021. Since October 21, 2023 entry is card-only.

How the service works

Line 5 runs on rubber-tired trains. The operator publishes the hours of the whole network: 5:00 to 24:00 Monday to Friday, 6:00 to 24:00 on Saturdays and 7:00 to 24:00 on Sundays. Those are the service hours of the whole network, the same at every station; the operator does not publish times at which trains call. The SEMOVI GTFS models a train every 3 minutes, an estimate. On September 28, 2026 the operator announced the start of sleeper replacement at OceaníaES as part of its maintenance; the notice says nothing about closures. To see the line within the whole network, open the Metro map.

The trains

The first trains were MP-68s and NM-73As and NM-73Bs with CAF cabs. In the 2000s NM-79, NC-82 and NM-83A trains arrived from lines 2 and 3, and the NM-73Bs were cut from nine cars to six for the quieter lines. In 2008 eight MP-68R93 trains and nine NM-73ARs were moved over from Line 9.

Frequently asked questions

The line has connecting tracks at all of its interchanges. Since it meets lines 1 and 3, they let trains be moved quickly to the heavy maintenance depots at Ticomán and Zaragoza without crossing those two very busy lines.

On May 4, 2015 two trains collided at Oceanía and twelve people were injured. A traffic controller let a train move before the platform was clear, and the driver did not switch to manual driving despite the rain.

The original plan included a “Simón Bolívar” station between Eduardo Molina and Consulado, but it was not built for lack of budget. The line opened without it on December 19, 1981.